April 2012 To November 2015

NDT Department Manager – Alnaba Alyaghin (NYCo.)
for Mentioned below various projects, Iraq
Management and leading all of the NDT Technicians in the various
projects in Iraq.
Attendance in Projects’ meetings with EPC/Client representatives.
Management the training requirements for all the NDT Technicians.
The Projects was performed by me on this company are as below:
1. Exxon Mobil NDT & Inspection Services for DS6, DS7, DS8.
SCOP RT Work For Three Gas Pipelines (28″,18″) 58 km Each.
RT Work For Three Gas Pipelines (24″,16″) 58 km Each.
2. Automatic welding for pipeline 24″ (30 KM)
3. Eni NDT & Inspection Services.
4. LAKESHORE NDT, Hydrostatic in Garraf Oil Field.
5. MEE Hydrostatic, PWHT, NDT in Garraf Oil Field. 2
6. KAR GROUP QA/QC in Construction of 78 km 20”Pipeline.
7. Gas Pipeline Hydrostatic Test Khormalla Oil Field 130 KM.
8. Petrofac NDT Work MAJNOON.
Shell Line Pipe 32″ Inspection in Store.
NDT Inspection. PWHT Services.
9. HALLIBURTON Fabrication, Inspection, NDT.
10. WEATHERFORD – UT & Hydrostatic in piping.
11. WEIR Service – NDT & PWHT
12. TAGC – NDT (RT, PT, Vacuum test, Hydrostatic, holiday test, coating)
for tanks and piping.
13. DANA Gas – NDT inspection.
14. ROSCO – RT for tanks.
15. ALAMCO – RT & PWHT.
16. 18. Sert Company – NDT & PWHT at HALFAYA oil field.
17. 19. HQC – NDT supply for most of Rumania oil field in Basra; Iraq.
18. UNAOIL – NDT.